N-35 · Hasan Abdal → Khunjerab
Karakoram Highway (KKH)
CautionThe Karakoram Highway connects Islamabad to Gilgit, covering approximately 600 km through Abbottabad, Mansehra, Besham, and Chilas before reaching Gilgit city. The journey typically takes 14-18 hours by road, though most travelers break it into two days with an overnight stop in Besham or Chilas. This route is considered one of the most scenic mountain highways in the world, running alongside the Indus River through dramatic gorges and high peaks. The stretch between Besham and Chilas is the most landslide-prone section, especially during monsoon season (July-August) and spring snowmelt. Road conditions can change quickly, so checking current status before departure is strongly recommended.
Last updated 2 days ago
- 1OpenBesham → Chilas228 km 6h 30m
- 2OpenChilas → Jaglot120 km 3h 15m
- 3OpenJaglot → Gilgit42 km 1h
- 4OpenGilgit → Hunza (Aliabad)100 km 2h 30m
- 5CautionHunza → Sost84 km 2h 15m
Minor landslide clearance underway near Passu.
- 6ClosedSost → Khunjerab Pass84 km 2h 30m
Seasonal closure — reopens April.
